Linux kernel project continuity
|
|
===============================
|
|
|
|
The Linux kernel development project is widely distributed, with over
|
|
100 maintainers each working to keep changes moving through their own
|
|
repositories. The final step, though, is a centralized one where changes
|
|
are pulled into the mainline repository. That is normally done by Linus
|
|
Torvalds but, as was demonstrated by the 4.19 release in 2018, there are
|
|
others who can do that work when the need arises.
|
|
|
|
Should the maintainers of that repository become unwilling or unable to
|
|
do that work going forward (including facilitating a transition), the
|
|
project will need to find one or more replacements without delay. The
|
|
process by which that will be done is listed below. $ORGANIZER is the
|
|
last Maintainer Summit organizer or the current Linux Foundation (LF)
|
|
Technical Advisory Board (TAB) Chair as a backup.
|
|
|
|
- Within 72 hours, $ORGANIZER will open a discussion with the invitees
|
|
of the most recently concluded Maintainers Summit. A meeting of those
|
|
invitees and the TAB, either online or in-person, will be set as soon
|
|
as possible in a way that maximizes the number of people who can
|
|
participate.
|
|
|
|
- If there has been no Maintainers Summit in the last 15 months, the set of
|
|
invitees for this meeting will be determined by the TAB.
|
|
|
|
- The invitees to this meeting may bring in other maintainers as needed.
|
|
|
|
- This meeting, chaired by $ORGANIZER, will consider options for the
|
|
ongoing management of the top-level kernel repository consistent with
|
|
the expectation that it maximizes the long term health of the project
|
|
and its community.
|
|
|
|
- Within two weeks, a representative of this group will communicate to the
|
|
broader community, using the ksummit@lists.linux.dev mailing list, what
|
|
the next steps will be.
|
|
|
|
The Linux Foundation, as guided by the TAB, will take the steps
|
|
necessary to support and implement this plan.
|