Currently ieee80211_csa_finish() function finalizes CSA by scheduling a
finalizing worker using the deflink. With MLO, there is a need to do it
on a given link basis.
Pass link ID of the link on which CSA needs to be finalized.
Signed-off-by: Aditya Kumar Singh <quic_adisi@quicinc.com>
Link: https://msgid.link/20240130140918.1172387-6-quic_adisi@quicinc.com
Signed-off-by: Johannes Berg <johannes.berg@intel.com>